Obtaining a Temporary Connection (Areas Other than the Colombo City) |
|
|||
Pre-requisite For an occasion where permanent supply connection is not needed Necessary poles with ‘D’ bracket and insulators have been erected and 7/.044, 7/0.52 or 7/1.064 service wires have been strung.
Not applicable.
Applications can be obtained from Offices of Area Engineers in respective areas.
None.
Week days 09.00 - 14.00
Cost estimates are given by respective Area Offices Time to provide service ( Normal and priority services) Within 3 days.
|